Azure Functions Node Worker Critical Path
Azure/azure-functions-nodejs-worker/.github/skills/azure-functions-node-worker-critical-pathcodingOfficial
Official Provider SkillView repo
Mandatory human-intervention gate for critical Azure Functions Node.js worker code. Use automatically or as /azure-functions-node-worker-critical-path for changes to Host-worker RPC/protobuf, gRPC startup, message routing, capabilities, app/module loading, programming-model registration, invocation conversion, specialization/environment/process state, hooks, termination, error sanitization, dependencies, bundling, packaging, pipelines, compatibility behavior, or tests that protect those paths. C
Files2 files
SKILL.md141 lines
Loading editor…
Install
RecommendedOne command — your agent picks it up automatically.
Select an AI agent above to see the install command.
or
Manual Install
More stepsDownload the archive and add the files to your project manually.
Skill details
Versionv1.0.0
AuthorAzure
Categorycoding
Skill IDAzure/azure-functions-nodejs-worker/.github/skills/azure-functions-node-worker-critical-path
Files2 files
Related skills
Azure Functions Node WorkerRepository-specific Azure Functions Node.js Host-worker architecture and change-validation workflow. Use for every implementation, fix, refactor, test, or explanation involving this repository, especially worker startup, gRPC StreamingMessage handling, initialization, specialization, metadata/indexing, function loading and invocation, programming models, hooks, converters, logging, process lifecycle, Node.js behavior, protobuf, build, or tests. Validate each code change against Host compatibilitAzure Functions Node Worker SecuritySecurity analysis for the Azure Functions Node.js worker. Use automatically or as /azure-functions-node-worker-security when code or a proposed change touches Host RPC input, function metadata, paths, package or module loading, require/import/eval, environment variables, process state, invocation data, protobuf conversion, hooks, logs, errors, credentials, gRPC transport, dependencies, build/release files, denial of service, or cross-invocation isolation. Identify evidence-backed vulnerabilitiesAsim Itp Validation TroubleshooterDiagnoses GitHub Actions runs for the ASIM ingestion-time parser validation workflow. Use when a user provides a run URL or ID, asks why an ITP target was missed or failed, or needs exact evidence-based remediation without automatic code changes.Asim Parser Filter ValidatorValidates ASIM parser filtering parameters by running filter tests against a Log Analytics workspace. Pure PowerShell using az CLI for authentication — no Python or Azure SDK packages required. Use this skill after creating or modifying an ASIM parser to verify that its filtering parameters work correctly.Asim Parser Github Pr PackagerPackages the created and validated ASIM schema parser into a GitHub PR for the Azure-Sentinel repository. Use this skill when asked to package a parser into a GitHub PR.Asim Parser Pr ReviewerReviews pull requests for ASIM parser changes and summarizes suggestions. This is not to be called by asim-parser-creator-orchestrator or when creating ASIM parsers in general. This is strictly for reviewing pull requests after necessary workflows have ran.